This story is currently available in anglais only — a translation isn't ready yet.
First two Alstom trains enter service on Cairo Metro Line 1
Transport Minister Kamel El-Wazir inaugurated operations in the presence of French Ambassador Éric Chevallier, under a contract for 55 trains, 495 cars and eight years of maintenance
ℹ️ Lecture par le navigateur · voix studio IA bientôt

Egypt has put the first two new air-conditioned trains into service on Cairo Metro Line 1, marking the start of deliveries under a contract with France's Alstom to supply 55 trains as part of a comprehensive modernization program for the country's oldest metro line.
Transport Minister Kamel El-Wazir attended the inauguration ceremony in the presence of France's Ambassador to Egypt Éric Chevallier, the head of the National Authority for Tunnels Tarek Gewaily, and representatives of Alstom. The minister rode one of the two trains from Saray El-Qobba station to El-Sadat station via eight intermediate stations, to inspect its technical specifications and its fittings for passengers.
The contract covers 55 air-conditioned trains comprising 495 cars; each train consists of nine cars, and it includes eight years of maintenance, major overhauls and spare parts for each train, in addition to supplying modern equipment for the Tora workshop so that it is ready to maintain the new fleet.
The new trains include advanced air-conditioning systems, safe gangways between cars that allow passengers to move safely inside the train, surveillance cameras in both driver's cabs and in the passenger cars that transmit images directly to the central control center, display screens for passenger information and instructions, illuminated electronic maps of routes and stations, and spaces designated for wheelchair users equipped with securing systems.
The minister said the government intends to establish a unified control and monitoring center for all electric transport systems, alongside a central control center covering the railway network, which is about ten thousand kilometers long.
He explained that the modernization of Line 1 goes beyond introducing new trains to include rehabilitating the infrastructure and upgrading operating systems, as work is under way to rehabilitate and maintain 23 existing trains in cooperation with a Spanish company, while a consortium of Egyptian and French companies is handling the upgrading of signaling, communications, central control, track, power supply and electromechanical systems.
The ministry is preparing to tender the construction of the new El-Sheikh Mansour station between Ezbet El-Nakhl and New El-Marg to accommodate growing demand on the line. Line 1 extends 44 kilometers between Helwan and New El-Marg and serves 35 stations, and was the first metro line built in Africa and the Middle East, and the first line in the Arab region.
Sources — how we know this
- PrimaryDaily News Egypt