NoorSadaNoorSada
BREAKINGEconomyDeveloping✓ 2 sources

This story is currently available in anglais only — a translation isn't ready yet.

Ski resort to be built in Cholpon-Ata for 2.6 billion soms — plans presented to Japarov

The head of state was presented with the results of the development of Issyk-Kul district and Balykchy for 2021–2026: industrial output grew sixfold, and 65 infrastructure projects are being implemented in Balykchy.

Vitesse:

AK
Anna Kuznetsova
· 2 min read
View of Rukh Ordo in Cholpon-Ata, Kyrgyzstan, from the southeast · Photo: Firespeaker / Wikimedia Commons (CC BY-SA 4.0)

A ski resort is planned to be built in Cholpon-Ata with investment of 2.6 billion soms. Another tourism project envisages the construction of a water park in the Kes-Senir area. This was reported by the presidential administration following Sadyr Japarov's working trip to the Issyk-Kul region on 13 November.

During the trip, the head of state was presented with the results of the socio-economic development of Issyk-Kul district and the city of Balykchy for 2021–2026, as well as plans for the construction of new facilities.

Industrial output over the ten months of 2024 reached 826.2 million soms — six times more than the 2021 figure. By the end of the year, the authorities expect output to rise to 1.2 billion soms.

Six schools, nine kindergartens, four family doctor groups, nine feldsher-midwife stations, seven gyms and 13 mini-football pitches have been built and commissioned in the district. In addition, seven projects to provide the population with drinking water were implemented.

Wastewater treatment plants are currently under construction in Cholpon-Ata and the villages of Baktuu-Dolonotu, Bosteri and Kara-Oi. Construction of two 100-bed hospitals continues — in Cholpon-Ata and the village of Ananyevo.

In 2025–2026, 65 urban infrastructure development projects will be implemented in Balykchy. For this purpose, 2.2 billion soms have been earmarked from the republican budget, the Issyk-Kul Region Development Fund and the local budget.

Construction of the Zheti Duban Ordosu park, dedicated to the historical and cultural landmarks of the seven regions of Kyrgyzstan, is 90% complete. The cost of the project is 149.5 million soms.

Another facility in Balykchy is a new municipal market worth 538 million soms. Once construction is complete, it will be able to accommodate more than 350 retail outlets, and a parking lot for 200 cars will be provided for visitors.

In the education sector, two new kindergartens have opened in the city. A further 73 million soms from the local budget have been earmarked for the renovation of educational institutions.

Sources — how we know this

2 independent sources corroborated this