NoorSadaNoorSada
BREAKINGEditorialDeveloping✓ 3 sources

This story is currently available in англійська only — a translation isn't ready yet.

Uraloğlu Inspects Concrete Phase of Dülük-OSB Tunnel in Gaziantep

The minister said they expect the 3,500-meter twin-tube tunnel, together with its connecting roads, to be opened at the end of next year.

Швидкість:

MY
Mehmet Yılmaz
· 2 min read
Map: Gaziantep, Türkiye · Photo: NoorSada · Natural Earth

Minister of Transport and Infrastructure Abdulkadir Uraloğlu carried out an inspection at the opened section of the Dülük-OSB Tunnel in Gaziantep. AK Party Group Deputy Chairman Abdulhamit Gül, Gaziantep Governor Kemal Çeber, Metropolitan Municipality Mayor Fatma Şahin and members of parliament also took part in the inspection.

According to what Anadolu Agency reported, Uraloğlu faced journalists after the inspection and said the tunnel was being carried out in cooperation with the Metropolitan Municipality and the Presidency of the Organized Industrial Zone. "Together with the connecting roads, we are building a 3,500-meter twin-tube tunnel," Uraloğlu said, stating that around 50-60 thousand vehicles would pass through daily and that nearly 300 thousand citizens would travel along a safe, standard route. The minister noted that there are around 1400 factories in the area where the tunnel is located.

Uraloğlu, who reported that the concrete works had begun and that the second formwork had reached the tunnel entrance, said the ground was not very problematic and that they had spoken with the technical staff of the contractor company. Using the phrase "without making a firm commitment" regarding the opening schedule, Uraloğlu stated that they expect to put the tunnel at the service of the people of Gaziantep at the end of next year.

Uraloğlu and those accompanying him later carried out an inspection at the construction site where dual-carriageway works are continuing on the Gaziantep-Nurdağı highway.

Sources — how we know this

3 independent sources corroborated this